| HRWRP Acid Pit #1 | |||||||||||||||
| back to projects page | |||||||||||||||
| The HRWRP Acid Pit #1 is a very small area with a large acid pit beside a gob pile. This project was finished in the summer of 2003 to refill the pit, regrade and revegetate the area. Open limestone channels were installed to treat the run off. This site is located West of the Harsha locations. A phase two will take place to improve wetlands leaving the site and reclaim sites contributing to seeps on the project. | |||||||||||||||
| Pre Construction | |||||||||||||||
| Post Construction | |||||||||||||||